Horizon Industrial Park
Ground up construction including site work of 8 tilt-wall industrial buildings.
Suncoast
8 building industrial complex totaling 827,000 sf.
I-4 Beltway Logistics
Multi-building distribution center in Sanford, FL. 700,000 +/- sq ft.
McCoy Field Logistics
3 industrial buildings totaling 850,000 sf including 72 acres of sitework.
First Loop Logistics Park
4 buildings totaling 330,000 sf with all associated sitework, bridges, a connector parkway, and signalization.
Orlando Apopka Commerce Center
4 buildings totaling 1,250,000 sf and 100 acres of sitework that involved moving over 1M cubic yards of fill material.
Turnpike Commerce Center
2 buildings totaling 182,000 sf and 20 acres of sitework.
Transport Commerce Center
2 buildings totaling 262,724 sf and 17 acres of sitework.
Shaw Flooring Distribution Center
Build to suit for Shaw Industries, 220,000 sf and 22 acres of sitework.
Orlando Office Center
92,000 sf rear load industrial building inclusive of sitework and offsite work.
Ace Relocation
Build to suit industrial warehouse for Ace Relocation, 120,239 sf including 10 acres of sitework.
Lakeside Phase II
2 buildings totaling 414,000 sf and 48 acres of sitework. Building 1 is a 189,000 sf rear load building. Building 2 is a 225,000 sf front load building.
Horizon West 2&3
2 buildings totaling 210,000 sf. Both buildings rear load with a shared truck court.
Western Beltway
2 buildings totaling 191,000 sf and 18 acres of sitework.
American Tire at Beachline Lot 5
Build to suit for American Tire 132,000 sf rear load building and 12 acres of sitework.
Dimare
Build to suit for Dimare Produce 100,000 sf and 10 acres of sitework. Building included ripening rooms and storage mezzanine.
Building Excellence Through Collaboration
Contact HGR Construction today to discuss your construction needs and discover how our dedicated team can bring your vision to life.